Bearwood Lakes Golf Club

Bearwood Lakes Golf Club
click on image to go to Bearwood Lakes Golf Club Home Page

Sunday, 13 October 2013


After a lot of hard work the path on eight is completed and ready for tarmacing. We were also able to re-level a few poor areas, which also needed doing. The plan is to complete the paths on six, seven and eight. The path on six will be changed considerably to make the whole area look a lot better. Can't wait!



Monday, 7 October 2013

Hill wood

Hill wood looking much better after clearance of many trees and gorse from around the base.

Tuesday, 24 September 2013

The work never stops

The next phase of work is to upgrade the three red grit paths. The paths of six, seven and eight will be boarded and tarmaced like the others on the course. This will be a great upgrade. It doesn't improve the playing surface directly, but will continue to make the golf course look and feel much better.

Friday, 20 September 2013

New delivery

Our new tractor turned up today. Will really speed up the operation!.

Job done, paths next!

Tuesday, 17 September 2013

Drainage

Drainage work around the first green will really help the playabilityof this green surround all year round. We have now drained and gravel banded the right hand side of the greens, verticored the back, topdressed and seeded it all hopefully with today's rain it will all recover very well in time for winter.

More work to help create a better course for the winter at Bearwood Lakes. Next stop is the 11th green surround.

We did some preliminary work today and look what we found.

Irrigation install moled through the drainage. Great!!!!!

This is original drainage and the damage a fairway install can bring. I think there are hundreds of these to find. Oh well, we have all winter!!!

Friday, 13 September 2013

Rain

Seventeen mil of rain overnight. Good job we have spent the last two years on drainage. It will make a great difference.

The latest work has been some gravel banding on the right hand side of the first green. This area was always wet and now with the removal of the gorse, a main added and now some gravel banding this area should be much better, especially for you slicers!!!