Friday, 6 December 2013

Preperation for Turkey trot

I hope you course looks good because I can't see anything !! 

It is the Turkey trot today and to get the course right we have to start early. It's not ideal but the only way to get it all done these days is to put lights on all the equipment and do it in the dark !

Thursday, 5 December 2013

It has been a while since I wrote anything on this blog. Not because we haven't been busy, but quite the opposite. Since the paths have been finished on 6,7 and 8 we have concentrated on finishing the 6th tee complex. It looks great and will look super when it has all grown in. We have seeded the banks, which will take a little longer to come through, but it was quicker and cheaper and we can crack on with the next project. It will also perform much better in the long term.

We have now started and nearly finished draining the 7th ladies tee. It was always very wet and whilst we put in a drain keep the path dry,  it was sensible to try to drain the tee at the same time.


First we marked the drains, dug them and used a quick set level to ensure the correct fall. We used the lab results for the sand to ensure it would drain at 200mm depth, with a small fensoil amendment.



 We put the pipework in and connected it up and then put a 150 layer of shingle in.



 We then added the rootzone. The tees were built with no drainage and a 200mm kingsley rootzone so we could easily just repolace the rootzone exactly and it would have the right hydraulic pull to keep the tee dry.


The turf was replaced, the tee topdressed and the exit drain re-turfed. All done in four days, will last for years. The tee will need a little TLC in spring but it should be fine for play immediately.


The next job on the agenda is to improve the look of the first tee area and drain the white tee which is very wet. No rest !!




Sunday, 17 November 2013


Paths 

As many of you will have seen by now, we have completed the tarmaccing of the  remaining paths on the golf course. The paths on 6, 7 and 8 have been upgraded to match all the rest of the paths on the golf course. This is a great addition to the course. It will look neater and fit in with all the other paths, be easier to maintain and remove ongoing costs associated with re-levelling and topping up the old paths. 

Great work by Steve and Adam to get them ready on time!







Friday, 18 October 2013

Pitchmarks

although it is not Bearwood Lakes, here is a great video of how to repair a pitch-mark by the STRI.

http://www.youtube.com/watch?v=YvNVBjI3rhs


Sunday, 13 October 2013

Had a great trip to the Tillers turf farm, to look at how the turf we get it is grown and also some ideas for growing in the new 16th fairway. Believe it or not, but this is turf for a putting green. I think there will be enough for us!!



After a lot of hard work the path on eight is completed and ready for tarmacing. We were also able to re-level a few poor areas, which also needed doing. The plan is to complete the paths on six, seven and eight. The path on six will be changed considerably to make the whole area look a lot better. Can't wait!



Monday, 7 October 2013

Hill wood

Hill wood looking much better after clearance of many trees and gorse from around the base.